로고

kctr
KOR ENG
  • KC Certification
  • KC Certification
  • KC Certification

    홈페이지를 방문해주셔서 감사합니다.

    KC Certification

    KC Mark Necessity and Compulsory

    Anyone who wants to manufacture, import, distribute and/or sell products subjected to KC certification in Korea must undergo a certification process based on Korean standards. Testing has to be done by an in-country designated testing laboratory and relevant certification by the national institutes. If a KC-subjected product is manufactured, distributed, and/or sold without proper KC certification or falsely labeled, the concerned party shall be legally prosecuted by Korean authority which would be sentenced up to three(3) years in prison and/or fined up to 10 million Korean won.

    Electrical Appliance Safety Certification Safety Check for Electrical Appliances
    Electromagnetic Compatibility Certification Supplier Compliance Check of Safety
    Electromagnetic Compatibility Registration Interim Certification
    MEPS(Minimum Energy Performance System) E-Standby Program
    Consulting Process
    Product & Regulation
    Review
    Analyze the technical standards and detailed specification of the product and then confirm them with related 18 laws and regulations.

    And define the related test scope and methods according to the 23 types of KC certification.

    Preparation &
    Application
    Preparation of the formal KC certificate application with all required technical documents.
    Product Testing The product is tested by a designated testing laboratory authorized by the certification agency with the submitted samples

    and a formal test report shall be issued after completion if no failure happens.

    Factory Inspection
    (if applicable)
    Certification body sends auditor to inspect the manufacturing plant and issue a factory audit report accordingly.

    Actual field audit takes 2-3 days.

    KC Certification
    Approval
    Certification body reviews product test report with factory inspection results and issue a certificate

    if they pass the standards and requirements.

    Marking &
    Labeling
    Certified products shall bear proper KC mark and label by standards
    Follow-Up
    Services
    Periodic audit shall be conducted every two(2) years after certification(KC-Safety)

    and irregular post-market surveillance be done by the authorities, too

    Electrical Appliance Safety Certification

    Related Authorities
    • Ministry of Trade, Industry and Energy(MOTIE), Korean Agency for Technology and Standards(KATS)
    Related Directive
    • Electrical Appliances & Household Items Safety Control Act
    Target Items
    • Wire and power cord, switch for electrical equipment, power supply capacitor and filter, accessories for electrical equipment and fastener, electrical appliance protective parts, isolated transformer, electrical equipment, power tool, audio & video application, information and communication office equipment and lighting equipment, etc.
    Period for Acquisition
    • About 3-6 weeks depending on the product specifications and operation mode
    Materials required
    • Testing samples, Application form, POA, User’s manual, Circuit diagram, Parts list, Product specifications, technical documents especially showing quality of insulation materials(such as temperature characteristics and fire retardant characteristics, questionnaire for factory inspection, etc.

    Safety Check for Electrical Appliance

    Related Authorities
    • Ministry of Trade, Industry and Energy(MOTIE), Korean Agency for Technology and Standards(KATS)
    Related Directive
    • Electrical Appliances & Household Items Safety Control Act
    Target Items
    • Switch for electrical equipment, isolated transformer, electrical equipment, audio & video application, information and communication office equipment and lighting equipment, etc.
    Period for Acquisition
    • About 3-4 weeks depending on the product specifications and operation mode
    Materials required
    • Testing samples, Application form, POA, User’s manual, Circuit diagram, Parts list & layout, Product specifications, label design, etc.

    Supplier Compliance Check of Safety

    Related Authorities
    • Ministry of Trade, Industry and Energy(MOTIE), Korean Agency for Technology and Standards(KATS)
    Related Directive
    • Electrical Appliances & Household Items Safety Control Act
    Target Items
    • Electrical equipment, power tool, audio & video application, information and communication office equipment and lighting equipment, etc.
    Period for Acquisition
    • About 3-4 weeks depending on the product specifications and operation mode
    Materials required
    • Testing samples, Application form, POA, User’s manual, Circuit diagram, Parts list & layout, Product specifications, label design, etc.

    Electromagnetic Compatibility Certification

    Related Authorities
    • Ministry of Science & ICT(MSIT) and National Radio Research Agency(NRRA)
    Related Directive
    • Radio Wave Act
    Target Items
    • Information & telecommunication Equipment, Mobile phone & device, Radio module, etc.
    Period for Acquisition
    • About 3-6 weeks depending on the product specifications and operation mode
    Materials required
    • Testing samples, Application form, POA, User’s manual, Jig & program, Circuit diagram, Parts list & layout, Product specifications, Antenna specifications, etc..

    Electromagnetic Compatibility Registration

    Related Authorities
    • Ministry of Science & ICT(MSIT) and National Radio Research Agency(NRRA)
    Related Directive
    • Radio Wave Act
    Target Items
    • Conformity registration by in-country designated testing lab - Computers & peripherals, Broadcasting receiver, Electrical appliance, etc.
    • Conformity registration by self-test - Measuring instrument, Industrial machinery & tool, Connector, etc.
    Period for Acquisition
    • About 2-3 weeks depending on the product specifications and operation mode
    Materials required
    • Testing samples, Application form, POA, User’s manual, Jig & program, Product specifications, etc.

    Interim Certification

    Related Authorities
    • Ministry of Science & ICT(MSIT) and National Radio Research Agency(NRRA)
    Related Directive
    • Radio Wave Act
    Target Items
    • Newly developed device without formal conformity assessment standards.
    Period for Acquisition
    • About 3-4 weeks depending on the product specifications and operation mode
    Materials required
    • Application form, POA, User’s manual, Product specifications, Description of new technology, etc.

    Energy Efficiency – MEPS (Minimum Energy Performance System)

    Related Authorities
    • Energy Efficiency – MEPS (Minimum Energy Performance System)
    Related Directive
    • Energy Consuming Rationalization Act
    Target Items
    • 3-phase inducing motor, Transformer, Electric range & stove, Electric fan heater, Set-top box, Signage display, Electric fan, Bulb & Fluorescent light, Adapter, Charger, Refrigerating machine, Air compressor, etc.
    Period for Acquisition
    • About 2-3 weeks depending on the product specifications and operation mode
    Materials required
    • Testing samples, Application form, POA, User’s manual, Product specifications including electric data, etc.

    Energy Efficiency : E–Standby Program

    Related Authorities
    • Ministry of Trade, Industry and Energy(MOTIE), Korean Energy Agency(KEA)
    Related Directive
    • Energy Consuming Rationalization Act
    Target Items
    • Computer, Monitor, Printer, Fax machine, Copy machine, Scanner, Multi-printer, Auto power-saving device, Audio, Electric range, Door phone, Wired & wireless phone, Bidet, Modem, Home gateway, Hand dryer, Server, Digital converter, wired & wireless router, etc.
    Period for Acquisition
    • About 2-3 weeks depending on the product specifications and operation mode
    Materials required
    • Testing samples, Application form, POA, User’s manual, Product specifications including electric data, etc.